RESOURCES...


The staff of SKS Group includes Project Management, Procurement, Construction Management, Operation and Maintenance personnel possessing a wide range of management engineering talents, comprising total of over 800 distributed as shown below.

MAN POWER RESOURCES

S.No
Description
Mechanical
Electrical
Instrumentation
Civil
Insul& Refractor
Fire proofing
Total
1
Project Manager
8
2
1
1
12
2
Project Engineer
16
2
1
5
1
1
26
3
QA/QC Engineer
3
1
1
5
4
Safety Officer
4
5
5
Supervisor
25
5
2
4
2
1
39
6
Foreman
12
2
4
2
20
7
Welders
65
65
8
Pipe fabricator
40
40
9
Pipe fitter
40
40
10
Structural Fabricator
8
8
11
Structural Fitter
6
6
12
Electrician
8
8
13
Electrical fitter
5
5
14
Cable Jointer
4
4
15
Instrument Technician
6
6
16
Rigger
15
15
17
Insulator
25
25
18
Sheet Metal Fitter
20
20
19
Sheet Metal Fabricator
5
5
20
Refractory Mason
3
3
21
Painter
16
16
22
Sand Blaster
30
30
23
Wrapper
4
4
24
Scaffolder
20
20
25
Fire Proofing Technician
4
4
26
Carpenter
4
4
27
Bar bender
3
3
28
Mason
6
6
29
Helper
120
25
6
38
7
5
201
   
371
54
16
125
65
11
643

 
EQUIPMENT RESOURCES

S.NO
DESCRIPTION
QUANTITY AVAILABLE
1
Hydraulic Cranes of Capacity
160 Ton - KATO 1990 model
1
25 Ton TADANO - Rough Terrain
1
20 Ton KATO
1
Total
3

2

Fork Lifts of Capacity

 

3 Ton
4

 

5 Ton
2
8 Ton
2
Total
8
3
Trucks / Trailers
Boom Truck - 3 Ton
1
Boom Truck - 6 Ton
1
Trailer long bed 40 ft
2
Steer Skid (Bobcat )
1
Dump Truck
1
Total
6
4
Welding Machine
Electric
5
Diesel Engine Driven - 250 A
5
Diesel Engine Driven - 300 A
4
Diesel Engine Driven - 450 A
10
Diesel Engine Driven - 500 A
30
MIG Welding Machine
2
Tig Welding Set
6
Total
6
5
Special Tool & Machineries
5
Internal Sandblasting Machine
5 sets
RTRP Special Tools for all sizes
6
Cold Cutting Machine up to 42”inch
2
Big Welding Machine
Total
18
6
Air Compressors 250 CFM ~ 750 CFM
18
7
Generators 25 KVA ~ 100 KVA
7


Website Designed by SKSGROUP I.T TEAM WORK. All Rights Reserved, Kuwait
Top